P V Bhagwat
Articles written in Pramana – Journal of Physics
Volume 59 Issue 5 November 2002 pp 719-724
14 UD Pelletron Accelerator Facility at Mumbai has been operational since 1989. The project MEHIA (medium energy heavy ion accelerator) started in 1982 and was formally inaugurated on 30th December 1988. Since then the accelerator has been working round the clock. Improvement in accelerator performance and operational experience are described.
Volume 59 Issue 5 November 2002 pp 739-744
Status report on the folded tandem ion accelerator at BARC
P Singh S K Gupta M J Kansara A Agarwal S Santra Rajesh Kumar A Basu P Sapna S P Sarode N B V Subrahmanyam J P Bhatt P J Raut S S Pol P V Bhagwat S Kailas B K Jain
The folded tandem ion accelerator (FOTIA) facility set up at BARC has become operational. At present, it is used for elemental analysis studies using the Rutherford backscattering technique. The beams of1H, 7Li, 12C, 16O and 19F have been accelerated up to terminal voltages of about 3 MV and are available for experiments. The terminal voltage is stable within ±2 kV. In this paper, present status of the FOTIA and future plans are discussed.
Volume 97, 2023
All articles
Continuous Article Publishing mode
Click here for Editorial Note on CAP Mode
© 2023-2024 Indian Academy of Sciences, Bengaluru.